Village Accepted Amount ALBERTA BEACH Resurface 47 Street. $24,360 Resurface portions of 46 Street, Grade Road, and 45 Avenue. $40,000 ALIX Upgrade the Rahr Park wastewater lift station. $60,000 Replace a portion of waterline and repave Railway Avenue. $50,000 ALLIANCE Replace local wastewater pipes. $30,736 AMISK Construct an addition to the library. $18,000 Replace a section of the sewer main system. $30,000 Purchase a garbage truck. $16,000 ARROWWOOD Complete an infrastructure assessment study. $14,668 BARNWELL Construct a village office building. $126,281 BARONS Purchase a tractor mower. $32,797 BEISEKER Complete a downtown road, drainage, utility, and streetscape $20,000 rehabilitation study. Repave a portion of Crescent Drive. $100,320 Replace a portion of sidewalk. $50,000 BERWYN Upgrade the water treatment plant. $107,000 BIG VALLEY Construct a tourist facility. $63,045 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 21 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 BITTERN LAKE Install wiring, a cement driveway, and garage door openers for the $36,068 public works shop. BRETON Replace fire hydrants. $25,000 Pave a portion of 49 Street. $29,239 CARBON Construct roads and water and wastewater services in a new $621,708 subdivision. CARMANGAY Replace water and wastewater lines and pavement on Grand $393,450 Avenue. CHAUVIN Install a water mainline. $40,164 CHIPMAN Replace a dump truck and grader. $43,008 Pave local roadways and replace curbs and gutters. $846,027 Replace the water reservoir pump. $20,300 CLIVE Pave a portion of 51 Avenue. $189,720 COWLEY Renovate the administration and public works shop building. $21,400 CZAR Purchase a multi-purpose maintenance vehicle. $18,270 Purchase a rescue van. $17,750 Rehabilitate local roadways. $29,876 DELBURNE Contribute funding to the library board for library roof construction. $2,000 Develop an infrastructure master plan. $53,000 DERWENT Install, rehabilitate, and replace water meters. $25,885 DEWBERRY Construct a water reservoir. $31,969 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 22 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 DONNELLY Extend several waterlines. $179,000 Replace and rehabilitate aging manhole structures. $30,000 Contribute funding to the construction of the East Side Playground. $10,000 EDBERG Rehabilitate a water tower. $91,966 Purchase and install an emergency generator. $10,625 EDGERTON Install a new ice plant in the local arena. $77,512 ELNORA Purchase a mower. $15,400 EMPRESS Upgrade a recreational vehicle park. $20,000 FOREMOST Undertake an industrial park expansion. $68,362 Purchase a public works tractor. $67,000 FORESTBURG Reconstruct a portion of 54 Street. $73,196 GADSBY Install a sewage collection system. $586,376 Purchase a water analyser for testing water quality. $8,000 GALAHAD Rehabilitate Lady Vivian Avenue East Cul-de-Sac. $66,000 GLENDON Purchase a garbage truck. $84,643 HALKIRK Purchase and install a radio-read water metre system. $50,000 Rehabilitate local roads. $17,500 HAY LAKES Purchase a modified public works truck. $20,000 Purchase a tractor mower. $15,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 23 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 HAY LAKES Install water meters. $37,010 HEISLER Develop road and water system infrastructure plans. $18,000 Purchase a road sander. $13,000 HOLDEN Replace a recreation grounds shed. $5,855 Replace a grader. $125,000 HUGHENDEN Pave a portion of Selkirk Avenue. $17,000 HYTHE Resurface the sidewalks along Main Street. $30,000 Purchase a new front-end loader. $150,000 Drill and install a water well. $15,000 IRMA Resurface a portion of 51 Avenue. $160,297 Construct a fire hall. $329,000 LINDEN Rehabilitate a portion of First Street. $194,091 LOMOND Purchase a garbage truck. $10,000 Replace a snowplow. $5,000 MANNVILLE Install water meters. $80,500 MARWAYNE Repave South First Street, and replace the curbs, sidewalks, and $147,030 sewer and water mains. MUNSON Contribute funding to a non-profit organization for the construction $102,421 of the Munson Community Hall. MYRNAM Replace the curling rink roof. $26,765 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 24 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 MYRNAM Upgrade the water treatment plant. $11,210 Purchase and replace water main valves. $9,588 Construct a pathway from Mainstreet to Lodge Road. $5,445 Replace concrete sidewalks. $19,464 Replace the curb and gutter on 50 Avenue and 51 Street. $32,971 NAMPA Construct a wastewater lift station and forcemain. $135,012 NEW NORWAY Purchase and install new water meters. $37,599 NOBLEFORD Renovate the Nobleford Community Complex and Curling Rink. $45,000 Develop a 60-lot subdivision with the necessary infrastructure. $755,000 Purchase a grass mower. $20,000 Purchase a wildland response vehicle for the fire department. $20,000 PARADISE VALLEY Replace breathing apparatus equipment for the fire department. $3,040 Pave a portion of Park Avenue. $26,690 ROCKYFORD Replace wastewater collection lines and expand the wastewater $935,000 collection site. ROSEMARY Replace a sewer lift station. $49,374 RYCROFT Rehabilitate sewer line manholes. $20,000 Replace water meters. $154,700 SPRING LAKE Purchase a snow removal truck. $75,000 Rehabilitate a local municipal building. $7,500 Pave Poplar Crescent and Pine Avenue. $227,000 Pave Stanley Close. $6,297 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 STIRLING Reconstruct a portion of roadway. $78,626 STROME Construct water and wastewater lines along 49 Street and 48 $102,900 Avenue. THORSBY Repave portions of 49 Street and replace the curbs and gutter. $453,091 TILLEY Replace curb stops. $10,395 Replace water meters. $4,300 Replace fire hydrants. $24,000 Replace waterlines. $4,300 VETERAN Renovate the village office. $41,651 Contribute funding to the construction of the Acadia Lodge seniors $18,326 housing project. Install glass in the local arena. $7,624 Install a new arena scoreboard. $4,518 Purchase a manual angle broom for a street sweeper. $4,650 VILNA Purchase water and sewer maintenance equipment. $7,000 Relocate a historic school building. $30,000 Replace the Bonnie Lake Campground playground. $30,000 WABAMUN Construct a waterfront spray park. $305,000 WARBURG Install new sidewalks. $30,000 Convert the basement of the town office and library into meeting $30,000 rooms. WARNER Upgrade the water systems in the civic centre. $39,458 WILLINGDON Replace water main valves. $5,789 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts may not reflect approved amendments. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2009 Accepted Projects Report Profiles received between: January 1, 2009 and December 31, 2009 As of March 23, 2010 WILLINGDON Renovate the village office washroom. $6,880 Repave sidewalks and streets. $30,500 YOUNGSTOWN Replace local sidewalks. $30,000 Summer Village Accepted Amount