Village Accepted Amount ACME Rehabilitate the existing wastewater line by installing a liner. $400,000 ALBERTA BEACH Construct a public works building. $276,659 ALIX Upgrade lagoon pond banks. $50,000 Rehabilitate the railway crossings at Main Street and 47 Street. $12,000 Replace a storm water conduit. $20,000 Rehabilitate a portion of Railway Avenue. $50,000 Rehabilitate portions of several roads. $50,000 ALLIANCE Purchase a loader including snow blade attachment. $45,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 23 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report AMISK Assess municipal infrastructure and develop a long-term capital $125,000 plan. BARONS Replace a tractor mower. $38,000 Replace the breathing apparatus in the fire hall. $20,000 Upgrade the wastewater system, including replacement of several $33,000 manholes and an outtake pipe. Complete an assessment study of the storm water system. $25,000 Install water valves and fire hydrants. $30,000 BIG VALLEY Rehabilitate 2 Avenue, including storm water drainage and $309,475 pavement. Replace water valves. $75,000 BRETON Construct a road and storm water ditches adjacent to Fraser Drive $246,725 and install water and wastewater infrastructure. Install several fire hydrants. $52,400 CARBON Complete the final phase of renovations in the administration $20,000 building. Design and construct a fire station. $705,000 Inspect wastewater lines and prepare an assessment report. $10,200 Upgrade the electrical system in the campground. $40,250 Replace portions of wastewater lines. $70,000 CARMANGAY Complete a major clean-up of a lagoon. $30,000 Purchase a backhoe. $55,000 Replace the roof on the administration building. $7,000 Install fire hydrants. $28,000 CHAUVIN Purchase and install automated gas meter readers. $25,000 Pave 3 Avenue from Main Street to Dominion Street. $123,584 CLYDE Purchase and install water meters. $54,803 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 24 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report CLYDE Install a water main along a portion of Highway 18 to connect to $100,814 the existing water distribution system. Pave a portion of 49 Street and rehabilitate a portion of 52 $47,033 Avenue. COUTTS Jointly construct a regional water line with the Town of Milk River. $367,000 CREMONA Replace the sidewalk on Railway Avenue. $25,000 CZAR Rehabilitate several streets, including pavement and installation of $178,407 sidewalks. DELIA Replace wastewater lines. $244,451 DONALDA Replace the heating, ventilation, and air conditioning units in $18,042 the Village Complex. Replace a wastewater line. $40,308 Purchase a tractor and a mower with attachments. $81,103 Purchase a public works vehicle. $52,875 Contribute funding to the County of Stettler for the joint purchase $25,000 of a pumper truck. Purchase a snow plow attachment. $6,999 DONNELLY Install a main distribution waterline. $149,000 Purchase and install upgraded water meters. $62,000 DUCHESS Pave a portion of Prairie Winds subdivision and 1 Street. $250,000 Install a wastewater bypass line parallel to Highway 550. $90,500 Install a lift station for a storm water retention pond. $30,000 ELNORA Replace a section of wastewater line. $15,000 Purchase a skid steer. $10,000 Develop a Storm Water Management Plan. $25,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report EMPRESS Purchase a modified truck for use as a gravel truck for garbage $135,000 and snow removal. FOREMOST Rehabilitate the Foremost and District Civic Centre and $80,000 Recreational Facility, including replacement of siding and the swimming pool filtration system. Purchase a front-mount mower. $17,000 Upgrade the wastewater lift station. $73,435 Upgrade the raw water pump and system controls. $68,110 FORESTBURG Replace wastewater lines. $302,825 Repave portions of several roads. $225,957 GALAHAD Replace the electrical panel and the structure housing the water $7,000 wells. Inspect water and wastewater lines, and prepare an underground $25,000 infrastructure capital plan. Develop a community park, including washroom facilities. $32,000 GIROUXVILLE Pave a portion of 50 Avenue, replace sidewalks, and install a $177,913 storm water line. GLENWOOD Construct the Glenwood Community Centre including rehabilitation $765,048 of associated library space and relocation of the village office. HALKIRK Pave a portion of Howard Street. $80,000 HAY LAKES Conduct a drainage assessment and geotechnical study and pave $60,930 several local roadways. Purchase an emergency generator and install transfer switches. $52,621 Replace the bobcat and purchase attachments. $25,776 HEISLER Develop a new municipal park. $22,000 HILL SPRING Rehabilitate a skating rink. $7,000 Install a storm water line. $17,760 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report HILL SPRING Extend portions of the village's drainage ditch network. $149,423 HUGHENDEN Purchase snow removal equipment. $79,000 Rehabilitate the wastewater lagoon. $190,000 HUSSAR Construct a wastewater lift station. $285,841 INNISFREE Contribute funding to the County of Two Hills for construction of a $55,944 regional waste transfer site. Contribute funding to the Alberta East Central Water Corporation $73,920 for a regional water system. IRMA Upgrade 50 Street and replace the water and wastewater lines. $241,960 Purchase tractor mowers. $29,101 LOMOND Replace several residential and business water meters. $40,000 Purchase a new tractor bucket. $6,700 Replace the roof on the village office. $10,160 Replace the roof on the water treatment plant. $6,500 Replace residential cast iron water lines. $71,942 Upgrade the water treatment plant. $59,421 Replace the tractor-mounted mower. $6,300 LONGVIEW Construct a wastewater lagoon. $388,277 LOUGHEED Rehabilitate the roof of the administration building and public $14,298 library. Construct an access road for a commercial district. $32,000 MARWAYNE Replace portions of water and wastewater lines. $251,197 MILO Replace several curb stops. $200,000 Purchase a skid steer. $35,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report MILO Purchase land and a facility for the Public Works Department. $50,000 Inspect the wastewater lines using camera technology. $16,726 Rehabilitate the Snake Valley Drop-in Centre. $15,500 Rehabiliate the administration office. $9,600 MINBURN Rehabilitate a baseball field, including installation of fencing and $10,000 bleachers. Rehabilitate a portion of Main Street. $50,000 Purchase a maintenance truck. $8,500 Purchase a video security system to monitor village roads. $25,000 Upgrade infrastructure for a wireless internet network expansion. $30,000 Install infrastructure for a new subdivision including roads, $40,000 sidewalks, and a sewer line. MORRIN Replace a portion of the wastewater lines along 2 Avenue. $300,000 MUNSON Purchase a computer for use with infrastructure management $7,200 system software. Rehabilitate portions of several streets. $24,000 Purchase a sanding truck. $50,000 Purchase a tractor. $32,000 MYRNAM Purchase a water truck. $35,000 Purchase a bobcat and attachments. $27,000 NAMPA Rehabilitate a portion of Railway Avenue. $241,000 NEW NORWAY Construct a pumphouse. $150,544 PARADISE VALLEY Replace fire hydrants. $8,300 Purchase a loader. $100,865 ROSALIND Construct water and wasterwater lines. $42,390 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 28 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report ROSALIND Drill a water well. $18,000 Purchase a tractor with additional components. $15,330 ROSEMARY Install water mains on Lupin Avenue and Aster Street. $115,000 Rehabilitate the wastewater line along Centre Street and Aster $44,100 Street. RYLEY Replace a dump truck. $25,000 Replace a lawnmower. $20,000 Rehabilitate existing wastewater lines by installing a liner. $150,000 SPRING LAKE Construct a recreational trail system. $15,200 STANDARD Install an aeration system at the raw water reservoir. $75,000 Replace water and wastewater lines. $900,000 Purchase a tractor. $35,000 STIRLING Construct a storage facility and install fencing at the local sports $60,000 complex. Upgrade the swimming pool. $50,000 Pave and upgrade portions of 2 and 3 Street between 4 and 5 $193,658 Avenue. STROME Complete engineering work to extend 48 Street and 49 Street to a $10,500 new subdivision. Purchase a public works vehicle. $10,000 Replace water main valves and upgrade manholes. $180,000 Purchase a grader. $15,000 VETERAN Replace the garbage truck. $20,000 VILNA Rehabilitate and replace fire hydrants. $87,750 Upgrade the Vilna Water Treatment and Distribution Facility. $105,720 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 29 Project descriptions and amounts include accepted amendments as of June 8, 2012. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2011 Accepted Projects Report WABAMUN Construct a playground in Waterfront Park. $133,046 Upgrade the parking lot in Waterfront Park. $133,046 WARBURG Pave a section of and construct sidewalks along 52 Avenue and $142,205 45 Street. Jointly construct an addition to the fire hall with Leduc County. $23,700 Replace portions of several sidewalks. $25,000 Purchase a mower. $10,000 WASKATENAU Construct a shelter for an emergency response vehicle. $15,000 Replace the roof on a water facility. $10,000 WILLINGDON Construct an addition to the firehall. $50,000 YOUNGSTOWN Rehabilitate several roads. $150,000 Summer Village Accepted Amount