Village Accepted Amount ALIX Prepare an infrastructure study on Railway Avenue. $60,000 Prepare a lift station study. $50,000 Rehabilitate a portion of 47 Street. $80,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report ALLIANCE Pave 1 Avenue and repair other roads. $43,721 Replace sidewalks on Main Street. $116,201 Purchase a mower and multi-purpose equipment. $16,500 Install streetlights and power lines in the west end subdivision. $71,000 Replace several sidewalks. $13,799 Rehabilitate the storm water drainage and culverts. $15,000 BARONS Install siding on a fire hall and purchase breathing apparatus and $40,000 other specialized firefighting equipment. Replace street lighting with energy efficient fixtures. $29,700 Construct a playground fence. $30,000 Relocate the tennis and basketball court. $20,000 Rehabilitate a portion of roads. $30,300 BAWLF Upgrade the water treatment plant. $553,125 BEISEKER Replace several sidewalks. $50,000 BERWYN Upgrade the fire hall washroom and install shelving. $10,750 Purchase playground equipment. $10,600 Regravel several roads. $11,000 BIG VALLEY Rehabilitate a wastewater line along 3 Avenue. $90,000 BOYLE Construct roads and install underground utilities in a new $1,486,909 subdivision. BRETON Rehabilitate 50 Avenue and 50 Street. $381,600 CARMANGAY Replace water and wastewater lines along Elmore Street. $424,000 CAROLINE Upgrade the water treatment plant, including water control system, $185,871 pump and back-up generator. This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report CHAUVIN Upgrade a portion of Queen Street, including underground utilities. $70,000 Replace a water pump. $35,000 CHIPMAN Extend the waterline to the end of Main Street and install a hydrant. $47,630 Replace the sidewalk along 49 Avenue. $55,000 CLYDE Upgrade the water treatment plant. $320,000 COUTTS Construct a sand storage shed. $36,000 Construct an addition to the public works shop. $210,000 CZAR Repave several roads. $294,564 Purchase a lawn mower. $15,734 Replace a portion of sidewalks on 50 Street and 52 Street. $32,203 DELBURNE Conduct a wastewater line replacement study. $97,000 Rehabilitate 21 Avenue, including underground utilities. $465,000 DONALDA Inspect wastewater lines. $70,000 Purchase and install water meters. $110,000 Rehabilitate the fuel holding compound. $30,223 Rehabilitate Bond Street west for dust control. $16,632 DONNELLY Purchase a tractor with attachments. $49,500 Replace a wastewater lift station pump. $10,660 Upgrade the administration building. $8,757 Haul gravel for road rehabilitation. $8,911 Replace the administration building sidewalks. $14,500 DUCHESS Construct a recreation centre. $456,292 EDBERG Replace a portion of the water main. $33,475 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 28 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report EDBERG Reline the water tower. $32,000 ELNORA Purchase a public works truck. $16,506 EMPRESS Upgrade utilities at Peter Fidler recreational vehicle park, including $50,000 water and wastewater. Purchase protective firefighting equipment. $10,125 Upgrade the administration building, including the floor, lighting $23,022 and windows. Construct a splash park at Centennial Park. $128,538 Replace water and wastewater lines. $15,000 Rehabilitate several roads. $8,665 FERINTOSH Upgrade the water treatment plant, including main pump, pressure $55,435 tanks, alarm system and fence. Upgrade the washrooms at Ferintosh campground, including the $45,000 installation of water, lights and heat. FOREMOST Rehabilitate several roads. $94,765 FORESTBURG Replace water lines. $55,000 Rebuild 56 Street. $198,972 GALAHAD Rehabilitate roads and sidewalks. $120,000 GLENDON Purchase mowers and a grader. $48,937 Install a water and wastewater station. $18,350 Upgrade Rainbow Park, including street lights and speed bumps. $10,991 Replace a backhoe with bucket attachment. $11,594 GLENWOOD Replace curb stops. $23,100 Upgrade the Pioneer Parlour and Cheese Factory Museum, $12,285 including electrical, roof and cabinets. This report reflects the name and status in effect for each municipality at the time the report was produced. Page 29 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report HEISLER Replace playground equipment. $25,000 Repave Main Street. $125,389 Replace the pumps in the west end wastewater lift station. $50,000 HILL SPRING Replace a portion of a storm water line. $12,500 Upgrade the Community Centre, including the furniture, electrical $85,900 and landscaping. Rehabilitate roads east of Highway 800 for dust control. $58,798 HOLDEN Install and rehabilitate community signs. $9,270 HUGHENDEN Replace the makeup air unit at the water treatment plant and $50,000 purchase a water distribution pump. Replace the administration building insulation, exterior siding, and $25,000 eaves. Replace a portion of the main waterline. $50,000 INNISFREE Purchase a lawn mower and utility vehicle. $16,000 Purchase a loader. $40,000 Purchase a lift station pump. $9,195 Replace the roof of the administration office. $25,000 Repave a portion of 51 Street and 53 Street. $10,500 Replace a portion of road and waterline on 53 Street. $17,675 IRMA Jointly rehabilitate the gravel Golf Course Road with the Municipal $80,606 District of Wainwright. Rehabilitate the wastewater lagoon. $27,900 Replace a portion of sidewalk along 50 Street. $17,000 Upgrade the water treatment plant. $13,588 LINDEN Rehabilitate several roads, including the storm water infrastructure. $569,281 MINBURN Purchase a compressor and a tractor with attachments. $31,500 Rehabilitate the lagoon. $65,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 30 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report MORRIN Replace wastewater lines and road on Block 6 north. $323,834 MUNSON Rehabilitate roads. $68,095 MYRNAM Replace the fire rescue unit. $66,667 Replace the ice resurfacer. $25,714 ROSEMARY Extend the waterline along Centre Street. $22,800 Rehabilitate the wastewater line along Iris and Rose Street. $65,000 Pave Cottonwood Crescent. $100,240 Rehabilitate the wastewater line along Railway Avenue. $140,000 RYCROFT Upgrade a wastewater line. $187,365 RYLEY Rehabilitate the public work buildings. $45,000 Upgrade a wastewater lift station. $120,000 Replace the roof of the Ryley Curling Club. $15,000 SPRING LAKE Purchase a skid steer with attachments. $70,000 Install a water cistern. $25,000 Construct a multi-functional outdoor park. $380,000 STANDARD Replace lawn tractors. $17,000 Upgrade the washrooms and signs at the campground. $9,627 STIRLING Realign Kipp Coulee Creek and construct a berm. $115,000 Rehabilitate the Michelsen Farmstead historic site, including roof $25,465 replacement and painting. Purchase a skid steer. $39,916 Install a storm water conduit along a portion of 6 Avenue. $22,960 Extend the wastewater line along 6 Street. $34,000 Rehabilitate the Family and Community Support Services Centre. $100,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 31 Project descriptions and amounts include accepted amendments as of May 20, 2015. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report STIRLING Construct an equipment storage facility. $90,000 Purchase a fire rescue vehicle and pumper truck. $51,500 Pave a portion of 5 Avenue and 2 Street. $180,000 Construct a portion of a road. $65,000 STROME Conduct a system wide review of water and wastewater lines. $50,000 Prepare a road assessment study for 48 Street. $16,728 VETERAN Reline the wastewater main on Lucknow Street. $60,000 Construct a municipal building. $35,000 Purchase a gravel truck. $8,000 Reline several wastewater lines. $32,000 Upgrade the water pump system. $19,806 VILNA Replace water well pump and casing. $8,890 Replace the wastewater lift station pumps and controls. $200,000 WARBURG Complete upgrades to the water treatment plant. $74,121 WARNER Upgrade Main Street, including curbs and gutters. $247,408 Purchase and rehabilitate distribution pumps for the water $30,985 treatment plant. WASKATENAU Rehabilitate several roads. $209,784 WILLINGDON Pave 49 Street between 51 Avenue and 53 Avenue. $41,439 Purchase various pieces of maintenance equipment and public $328,584 works vehicles. Rehabilitate the wastewater lagoon. $200,000 Summer Village Accepted Amount