Village Accepted Amount ACME Upgrade a portion of Cross Street, including underground utilities. $611,811 Upgrade water meters. $100,000 Extend a portion of waterline and wastewater line. $88,281 Replace a portion of wastewater line. $25,000 ALBERTA BEACH Replace a portion of roads. $839,108 ALLIANCE Replace fire hydrants. $27,000 AMISK Purchase a public works truck. $10,000 BARNWELL Purchase public works buildings, including the purchase of land. $200,000 BARONS Replace fire hydrants and manholes. $24,000 Upgrade the fire hall and the radio communication system. $45,800 Rehabilitate a portion of roads. $30,000 Purchase gravel for road rehabilitation. $15,000 Replace all municipal building lighting to energy efficient lighting. $20,000 Replace the municipal office roof. $15,000 BAWLF Rehabilitate a wastewater lagoon. $32,000 BEISEKER Purchase recycling carts. $24,861 Replace water main valves. $35,000 Replace a fire pumper truck. $34,000 Resurface portions of 4 Avenue and 9 Street. $383,401 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report BEISEKER Rehabilitate a portion of road. $20,000 Replace a lift station pump. $59,000 Rehabilitate the water reservoir roof. $22,000 BIG VALLEY Replace several sidewalks. $75,000 BITTERN LAKE Upgrade a pump house. $34,000 CARBON Stabilize the slope and rehabilitate the Kneehill Creek pedestrian $543,543 bridge. CHAMPION Construct a public works shop. $244,249 Rehabilitate a portion of road. $30,000 Upgrade the administration office. $25,000 Construct gravel pathways. $15,000 Upgrade the irrigation system. $20,000 Upgrade the public works yard. $85,000 CHAUVIN Upgrade a portion of water and wastewater lines. $105,000 CHIPMAN Upgrade the Chipman National Hall. $80,000 Replace public works equipment. $24,880 Replace several sidewalks. $80,000 CONSORT Replace the aquatic facility. $518,615 COUTTS Construct a raw water storage pond. $115,000 Replace several water main valves. $44,000 Upgrade the fire hall, including furnaces. $16,000 CREMONA Pave several streets, including sidewalks. $401,272 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report CZAR Purchase a tractor, including attachments. $87,000 Rehabilitate portions of sidewalks along 49 and 50 Avenue. $260,800 DELBURNE Upgrade the administration office. $65,000 Prepare engineering plans for the replacement of 24 Avenue, $85,000 including underground utilities. Install a portion of waterline along 18 Street. $140,000 DONALDA Rehabilitate the village office. $100,000 Replace waterlines. $400,000 EDBERG Upgrade the water and wastewater lines along Main Street. $143,467 EDGERTON Rehabilitate a portion of roads. $188,679 EMPRESS Purchase firefighting equipment. $11,000 Contribute funding to the Hanna Firefighters Association for the $8,100 purchase of training equipment. FOREMOST Rehabilitate the administration office and public works shop roof. $56,000 Upgrade the swimming pool decking. $30,000 Rehabilitate a portion of roads and sidewalks. $157,548 FORESTBURG Construct a residential subdivision, including roads and $358,549 underground utilities. Rehabilitate a wastewater lagoon. $115,000 Purchase a loader. $60,000 GIROUXVILLE Upgrade a portion of 48 Street. $344,900 GLENDON Upgrade the arena lighting. $28,736 Purchase public works equipment. $59,457 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report GLENWOOD Upgrade the storm water drainage system. $31,000 Upgrade the community hall. $18,000 Map the water and wastewater systems. $35,000 Purchase a public works vehicle. $10,000 HEISLER Upgrade the water treatment plant system. $33,862 Repair a grader. $7,205 Upgrade a lift station. $30,000 Purchase a backhoe. $60,000 HILL SPRING Upgrade a lift station. $15,500 Replace a portion of wastewater line. $100,000 Upgrade the water treatment plant. $24,000 Develop plans for a community campground, including an $10,000 environment assessment. Install water isolation valves. $15,000 HINES CREEK Rehabilitate several roads. $510,000 HUGHENDEN Construct a bulk water station and outdoor wash bay. $86,000 Rehabilitate Hughenden Library. $12,000 Upgrade the water treatment plant. $20,000 Rehabilitate a portion of Rydberg Street. $310,000 Rehabilitate a portion of roads. $22,500 HYTHE Rehabilitate portions of roads. $102,953 Upgrade the water system. $50,000 Replace the roof on the village office and library. $25,000 INNISFREE Replace a lift station. $175,000 Rehabilitate a portion of waterline. $139,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 28 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report KITSCOTY Purchase a wheel loader. $41,350 LINDEN Install a portion of waterline and wastewater line. $103,622 Rehabilitate a portion of 1 Street Northwest, including sidewalks. $506,405 LOMOND Purchase public works equipment. $15,100 Purchase mowers. $24,850 Upgrade the cemetery. $6,840 Install security cameras. $8,550 Rehabilitate several roads. $16,620 Replace a portion of wastewater line along 2 Street South. $7,625 Replace a portion of wastewater line along 1 Street North. $56,222 LOUGHEED Purchase a skid steer and road sander. $10,895 Rehabilitate a wastewater lagoon. $51,000 Construct a fence around the public works shop. $11,660 Rehabilitate the water treatment plant. $300,000 MANNVILLE Rehabilitate a portion of 47 Avenue. $185,000 Upgrade the village office. $28,000 Rehabilitate the public works building roof. $25,420 Rehabilitate the fire hall roof. $18,810 Rehabilitate portions of 50 Street and 50 Avenue. $117,600 Conduct a wastewater lagoon assessment and upgrade lines. $16,500 MILO Upgrade the water treatment plant and purchase a water meter $53,200 reader. Rehabilitate roads, including sidewalks and storm water drainage. $319,000 Rehabilitate the wastewater lagoon. $40,000 Purchase computers and software. $10,000 Upgrade the municipal office. $65,000 Upgrade 1 Avenue and Centre Street, including signage, benches, $10,000 and bicycle stands. This report reflects the name and status in effect for each municipality at the time the report was produced. Page 29 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report NAMPA Rehabilitate several roads. $298,013 PARADISE VALLEY Rehabilitate portions of roads. $116,522 Install storm water culverts. $35,000 Upgrade the water distribution system. $86,000 Purchase a de-icing machine and street sweeper attachment. $21,747 ROCKYFORD Upgrade a portion of 2 Avenue, including underground utilities. $393,264 ROSEMARY Rehabilitate the wastewater lines along Iris Street and Henderson $76,900 Street. Upgrade Railway Avenue. $44,000 RYCROFT Pave several streets, including sidewalks. $1,283,775 RYLEY Replace a portion of wastewater line. $40,000 STIRLING Rehabilitate a portion of 4, 5, and 6 Street. $36,081 Replace wastewater lines. $190,000 Rehabilitate gravel roads. $850,000 Contribute funding to the Westwind School Division to develop $125,000 space for community events. VETERAN Rehabilitate a portion of wastewater line. $48,000 Upgrade emergency communication radios. $15,000 VILNA Replace the wastewater line along 49 Avenue West. $514,500 WABAMUN Install a portion of wastewater and waterlines. $144,265 Construct a downtown public square, including lighting, benches, $200,373 and parking. WARNER Inspect and rehabilitate wastewater lines. $40,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 30 Project descriptions and amounts include accepted amendments as of September 9, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2018 Accepted Projects Report YOUNGSTOWN Purchase a waste transfer vehicle and trailer. $40,000 Rehabilitate portions of roads. $100,000 Prepare an infrastructure management plan. $65,000 Purchase fire training equipment. $10,000 Rehabilitate the curling rink, including furnaces and water heater. $15,500 Summer Village Accepted Amount