Village Accepted Amount ACME Conduct an overland drainage study. $50,000 Replace several curb stops. $20,000 Replace several fire hydrants and water valves. $20,000 Upgrade a portion of wastewater lines. $50,000 Purchase and install water meters. $15,000 Purchase land to expand the campground. $45,000 Purchase a sanding truck. $15,000 AMISK Construct and loop several waterlines along 50, 51 and 53 Street. $87,500 Install a portion of waterline. $155,000 Purchase office equipment. $10,000 Purchase and repair welcome signs. $12,000 ANDREW Rehabilitate a portion of 53 Street and 53 Avenue. $213,140 Replace an administration building boiler. $18,000 ARROWWOOD Purchase a skid steer and attachments. $100,000 Purchase computers and hardware for utility readings. $30,000 Rehabilitate the municipal office building. $30,000 Install fibre-optic infrastructure. $50,000 Contribute funding to the Northwest District Recreation Board to $50,000 construct a multi-use trail system. Extend 2A Street East between 1 Avenue East and Railway $50,000 Avenue East, including underground utilities. Prepare an asset management plan. $50,000 BEISEKER Upgrade a wastewater lift station. $28,745 Upgrade a portion of water and wastewater lines. $20,000 Upgrade the water meter readers. $24,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 23 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report BEISEKER Upgrade a portion of 3 Avenue. $255,385 BERWYN Replace water main valves and infrastructure. $202,000 BIG VALLEY Pave roadways. $155,000 Purchase public works vehicle. $26,000 BITTERN LAKE Upgrade the waterline air release valves. $35,000 Purchase computers. $10,000 Upgrade the recreation area, including skating rink and $360,570 playground. BOYLE Replace the water treatment plant roof. $25,690 Construct a dressing room in the arena. $25,554 Pave several roads. $270,974 Purchase land for the construction of a municipal centre. $320,585 BRETON Rehabilitate a portion of roads. $34,860 Rehabilitate a wastewater lagoon. $60,700 CARMANGAY Upgrade a portion of waterline and wastewater line. $250,347 CAROLINE Replace a portion of 49 Avenue, including underground $1,150,000 infrastructure. CHAMPION Construct a pathway. $125,000 Upgrade the public works building. $15,758 CHAUVIN Pave a portion of roads. $120,000 CHIPMAN Rehabilitate the Chipman National Hall. $105,200 Purchase a sanding truck. $39,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 24 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report CLYDE Upgrade the water distribution plant and associated equipment. $98,750 COUTTS Replace the main waterline and valves. $38,204 Replace a waterline and valve. $15,000 Pave portions of roads. $58,000 CREMONA Pave several streets, including sidewalks. $187,000 Upgrade the water treatment plant. $28,400 Rehabilitate a portion of the storm water system along 1 Street $70,000 West. DELBURNE Rehabilitate a portion of road. $80,000 Resurface several roads. $45,783 Construct roads and underground infrastructure in the Fawn $275,226 Meadows subdivision. DELIA Upgrade a portion of water and wastewater line along 1 Avenue. $575,691 Replace several sidewalks. $152,000 Expand and upgrade the water reservoir. $764,405 Contribute funding to the Prairie Land School Division to $100,000 construct a library and gymnasium. DONNELLY Upgrade a portion of waterline and replace a water main valve. $34,005 Inspect and rehabilitate a portion of wastewater line. $52,213 Rehabilitate roads and sidewalks. $334,553 EDBERG Prepare a road, water and stormwater infrastructure study. $44,596 Purchase information technology equipment, including computers, $10,000 printers, monitors and office furniture. Upgrade a portion of 1 Street South, including water and $175,504 wastewater utilities. Upgrade the water tower. $13,000 EMPRESS Purchase firefighting equipment. $10,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report FOREMOST Expand the campground. $70,000 Prepare an asset management plan. $12,500 Purchase garbage bins. $38,000 FORESTBURG Rehabilitate portions of 57 Street West and install a storm $300,000 water swale. GIROUXVILLE Rehabilitate several roads. $15,000 GLENWOOD Upgrade storm water drainage. $79,000 HALKIRK Resurface gravel alleys. $10,000 Purchase mowers. $20,000 Expand and upgrade the fire hall. $180,000 HAY LAKES Replace a portion of sidewalk. $45,044 HEISLER Purchase a lift station heater and generator. $45,000 Replace water curb stops. $65,000 Rehabilitate a portion of Main Street. $25,000 HILL SPRING Upgrade the SCADA system to integrate the lift station. $12,000 Replace a portion of sidewalk. $33,000 Replace a water pump. $22,254 Replace culverts. $18,000 HUGHENDEN Replace a garbage truck and collection bins. $20,000 HUSSAR Replace a portion of 2 Avenue, including sidewalks and $468,782 underground utilities. HYTHE Upgrade a water well. $220,075 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report HYTHE Upgrade a wastewater lift station, including security and alarm $33,184 system. Reline the wastewater main. $235,996 Upgrade the administration building. $30,854 Develop and install a fibre-optic network. $115,000 Rehabilitate portions of 100 Street. $109,720 INNISFREE Replace the public works truck. $30,000 Upgrade the administration building. $68,200 Rehabilitate the public works facility. $10,704 Replace the water treatment plant chlorine monitor. $6,650 Purchase a public works truck. $11,000 Purchase public works maintenance equipment. $10,000 LONGVIEW Replace a portion of waterline and wastewater line. $964,165 LOUGHEED Replace the administration building roof. $59,000 Replace water main valves. $248,684 MANNVILLE Rehabilitate a portion of 52 Avenue. $228,000 Purchase computer hardware and security cameras. $21,500 Purchase an air compressor for the fire hall. $20,000 Purchase public works equipment. $38,000 Replace the roof on the water distribution building. $35,000 Upgrade the golf course kitchen. $15,000 Upgrade the roof on the golf course clubhouse. $15,000 Replace several water main valves. $20,000 Upgrade the public works and fire hall buildings. $17,000 Rehabilitate the arena road. $60,000 Replace the sidewalk along 50 Street. $20,000 Upgrade the downtown gazebo. $30,000 Upgrade the baseball diamonds and concession. $40,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report MARWAYNE Upgrade a portion of roads and storm water infrastructure. $144,979 MILO Replace the trees along Centre Street. $35,007 Upgrade waterlines and hydrants. $110,000 MYRNAM Upgrade the Construction and Technology Education Centre. $133,000 NAMPA Prepare an infrastructure management plan. $40,000 Upgrade a public works building. $30,000 Upgrade roads. $212,786 PARADISE VALLEY Construct a water distribution plant. $693,700 ROCKYFORD Replace fire hydrants. $42,500 ROSALIND Rehabilitate a portion of roads. $93,609 ROSEMARY Rehabilitate a portion of Rose Street and Iris Street. $321,210 RYCROFT Install street lights along Highway 2 and Highway 49. $44,711 RYLEY Reconstruct a portion of 52 Avenue between 52 Street and 57 $147,688 Avenue. SPRING LAKE Construct a public works storage building. $55,000 STANDARD Replace a portion of roads and underground infrastructure. $133,990 VETERAN Contribute funding to the Special Areas Board for the construction $421,019 of a fire hall. WABAMUN Upgrade the water treatment and distribution facility. $18,320 Replace the community hall air conditioning system. $30,490 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 28 Project descriptions and amounts include accepted amendments as of August 27, 2020. MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2019 Accepted Projects Report WABAMUN Rehabilitate roads and sidewalks. $120,000 Replace water main valves. $15,000 Upgrade the wastewater lagoon and lift station. $190,232 Upgrade storm water drainage. $14,000 Construct an ambulance parking lot. $10,000 WARBURG Rehabilitate portions of 53 Street and 51 Avenue. $558,342 WARNER Rehabilitate gravel roads. $51,000 Extend a portion of waterline and wastewater line. $125,000 WASKATENAU Rehabilitate a portion of 50 Avenue. $372,624 YOUNGSTOWN Upgrade the village public works shop. $30,500 Upgrade the library and village office. $15,000 Upgrade the curling rink chiller. $14,286 Upgrade the community hall. $21,716 Summer Village Accepted Amount