Village Accepted Amount ACME Upgrade several water meters. $73,109 ALIX Replace a loader. $175,000 ALLIANCE Rehabilitate several roads. $196,000 Replace a portion of wastewater line along 2 Avenue East. $27,701 Purchase a loader. $135,000 AMISK Install a portion of waterline along 54 Street. $10,000 Construct a fence around the public works yard. $20,000 Install waterlines along 50 Avenue. $75,000 Upgrade the water plant. $65,000 ANDREW Rehabilitate a portion of 52 Avenue. $68,300 Replace fire hydrants. $17,000 Reline several wastewater manholes. $106,200 BARNWELL Rehabilitate a portion of 2 Street East. $67,632 Rehabilitate a portion of wastewater line. $90,000 Upgrade 3 Street East, including underground utilities. $750,000 BARONS Upgrade the municipal office building. $12,000 Overlay several roads. $40,000 Purchase public works equipment. $30,000 Replace a fire pumper truck and equipment. $74,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of April 12, 2022. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2021 Accepted Projects Report BEISEKER Replace a portion of 7 Street. $181,332 BERWYN Replace a portion of sidewalks. $46,048 Rehabilitate a portion of roads. $99,000 BIG VALLEY Rehabilitate a water tower. $280,000 Pave a portion of roads. $210,000 BOYLE Replace streetlights along 4 Street. $165,046 Upgrade the water treatment plant. $46,664 Upgrade Railway Avenue. $97,000 Rehabilitate the waterlines, catch basins, sidewalks and overlay along 3 and 4 $1,256,708 Streets. Grade and asphalt the intersection at 1 Avenue and 3 Street. $16,594 CARMANGAY Replace several sidewalks. $21,289 Construct and loop waterlines along Camburn Street and Elmore Street. $96,841 Upgrade the water plant flow meter and hydrant. $20,000 Purchase a skid steer. $39,000 Replace a portion of wastewater line and install manholes. $25,000 CHAMPION Construct a fence around the public works shop. $21,000 Construct a pathway system. $43,953 CHAUVIN Construct a public works shop. $680,000 CHIPMAN Rehabilitate Main Street, including sidewalks. $121,702 CLYDE Upgrade portions of sidewalks. $88,426 Purchase a public works tractor. $80,000 Rehabilitate portions of roads and sidewalks. $398,078 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of April 12, 2022. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2021 Accepted Projects Report COUTTS Rehabilitate the wastewater lagoon. $8,778 Replace a portion of wastewater line. $8,276 CREMONA Pave the snow dump site. $11,165 DONALDA Purchase a mower. $10,000 Rehabilitate a portion of roads. $50,000 Purchase a public works vehicle. $15,000 DUCHESS Rehabilitate a wastewater lagoon. $83,000 EDBERG Rehabilitate a portion of roads, including underground utilities. $266,112 ELNORA Purchase public works equipment. $17,090 Upgrade the administration office. $13,500 Purchase a skid steer. $16,250 Prepare a pumphouse engineering assessment. $29,000 Upgrade a pumphouse. $66,000 EMPRESS Upgrade the fire hall. $10,123 FOREMOST Rehabilitate portions of roads and sidewalks. $11,865 Relocate and extend a portion of wastewater line. $42,325 Replace several fire hydrants. $28,104 Widen a portion of 1 Street West. $95,000 Purchase a skid steer. $67,209 GIROUXVILLE Replace a fire hydrant and water valve. $44,000 GLENDON Construct a storm water drainage system. $724,371 HALKIRK Upgrade the administration and public works building. $100,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of April 12, 2022. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2021 Accepted Projects Report HALKIRK Pave a portion of Berry Street South. $248,500 HEISLER Replace wastewater lines. $180,000 Replace a lift station. $10,000 Replace a lawn mower. $29,500 HILL SPRING Install fire hydrants and loop waterlines. $304,000 Convert a building into a recreational storage shed. $80,000 HINES CREEK Replace several sidewalks. $161,464 HOLDEN Replace the wastewater lines. $1,030,000 HUGHENDEN Purchase public works equipment and storage unit. $72,500 HUSSAR Upgrade a portion of 1 Avenue East, including water and wastewater lines. $371,306 INNISFREE Construct a community garden space. $10,000 Rehabilitate the administration building. $50,000 Contribute funding to the Alberta Central East Regional Waterline to construct a $74,333 waterline between the Village of Marwayne and Hamlet of Clandonald. Purchase public works equipment. $15,000 Install fire hydrants. $20,000 Purchase public works equipment. $8,000 IRMA Replace the water and wastewater lines along 50 Street. $710,290 LOMOND Rehabilitate a portion of water and wastewater lines. $40,471 Upgrade a water treatment plant. $70,000 LONGVIEW Construct and rehabilitate sidewalks. $35,475 Conduct pre-engineering plans for water and wastewater lines. $10,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 28 Project descriptions and amounts include accepted amendments as of April 12, 2022. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2021 Accepted Projects Report LOUGHEED Install storm water drainage along 52 Street. $50,000 Conduct a water treatment plant assessment. $65,180 Upgrade the water treatment plant and distribution system. $153,513 Replace fire hydrants. $16,500 Rehabilitate several waterline valves. $80,000 MANNVILLE Upgrade the cemetery. $44,000 Expand the municipal recreational vehicle park. $15,000 Purchase public works equipment. $50,000 Purchase golf carts for the Mannville Riverview Golf Course. $19,500 Purchase firefighting equipment. $15,000 MARWAYNE Upgrade a bulk water station. $12,000 MORRIN Replace a fire pump. $201,000 Rehabilitate portions of 1 Street South and Main Street. $105,213 Prepare engineering plans to upgrade the water and wastewater lines. $44,000 MYRNAM Upgrade water valves, hydrants, and drainage infrastructure. $30,000 Install wireless water meters. $20,000 NAMPA Upgrade Mill Brown Park, including walking trails and campground facilities. $55,332 Upgrade drainage along laneways. $240,000 Upgrade a portion of storm water infrastructure at 101 and 102 Avenue. $80,000 Conduct a storm water and wastewater assessment. $62,725 ROSALIND Rehabilitate several roads. $52,287 ROSEMARY Rehabilitate a wastewater line. $75,000 Rehabilitate the waterline along Tulip Street and Centre Street. $50,000 RYCROFT Purchase public works trucks. $81,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 29 Project descriptions and amounts include accepted amendments as of April 12, 2022. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2021 Accepted Projects Report RYLEY Replace a portion of wastewater line along 54 Avenue. $495,000 Reconstruct a portion of 49 Street, including sidewalks and storm water $213,123 infrastructure. SPRING LAKE Rehabilitate the storm water drainage system. $450,000 Upgrade the Wild Rose playground. $90,000 Rehabilitate several roadways. $300,000 Purchase a mower. $27,000 VETERAN Rehabilitate a portion of Waterloo Street and Alberta Avenue. $220,000 WARBURG Pave a portion of 51 Street and 52 Street. $295,000 WARNER Replace manholes and a portion of wastewater line. $115,000 Rehabilitate a water reservoir. $75,000 YOUNGSTOWN Replace fire hydrants. $25,000 Replace the pump in the water treatment plant. $30,000 Replace a portion of wastewater line. $48,654 Summer Village Accepted Amount