Village Accepted Amount ACME Construct walking trails. $100,000 Install water and wastewater infrastructure in the Heritage Estates subdivision. $53,000 Pave a portion of Bennett Avenue. $120,000 Replace underground infrastructure along Prospect Avenue. $252,027 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 22 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report ALBERTA BEACH Construct sidewalks. $36,595 Rehabilitate a portion of roads. $274,263 Rehabilitate portions of roads. $10,785 Rehabilitate the storm water outfall on 50 Avenue between 49 Street and 50 Street. $59,560 Upgrade the municipal campground washrooms. $100,000 Upgrade the storm water drainage system. $18,742 ALIX Pave and rehabilitate several roads. $167,197 Replace a skid steer. $86,500 ALLIANCE Install water and wastewater lines. $15,000 Rehabilitate a portion of storm water drainage conduit. $69,260 Rehabilitate portions of roads. $110,000 Replace waterline valves. $25,000 Upgrade the municipal office. $8,625 BARONS Install a security system. $3,600 Purchase a grader. $30,000 Purchase a public works truck. $65,000 Purchase a public works vehicle. $35,000 Purchase public works equipment. $8,600 Rehabilitate roads. $30,000 BAWLF Install fire hydrants. $40,000 Purchase a fire tanker truck. $70,000 Purchase a mower. $29,450 Rehabilitate a portion of wastewater line. $7,000 Rehabilitate a wastewater lagoon. $45,000 Rehabilitate sidewalks along MacRae Street. $30,000 Rehabilitate the 100 block of King Street. $20,500 Rehabilitate the 100 block of MacRae Street. $18,500 Rehabilitate the 100 block of Sanden Street. $22,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 23 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report BAWLF Rehabilitate the 200 block of King Street. $154,050 Rehabilitate the 200 block of MacRae Street. $18,500 Rehabilitate the 200 block of Sanden Street. $22,000 Rehabilitate the 300 block of MacRae Street. $18,500 Rehabilitate the 300 block of Sanden Street. $18,000 Rehabilitate the 400 block of Sanden Street. $11,000 Replace office computers. $10,000 Upgrade a portion of gravel road. $30,000 Upgrade the waterline along Hanson Street. $225,000 BEISEKER Rehabilitate a wastewater lagoon. $200,000 BIG VALLEY Purchase public works equipment, including water meters. $17,000 Replace sidewalks and drainage swales. $39,000 Upgrade the wastewater lagoon. $35,000 BOYLE Purchase a public works vehicle. $9,953 Replace a portion of sidewalk along 1 Avenue. $53,567 Replace a water pressure relief valve. $66,861 CARBON Purchase a skid steer and tractor. $24,414 Purchase public works equipment. $30,384 Rehabilitate roads and sidewalks. $114,054 Replace a portion of wastewater line. $9,395 Replace emergency radios. $9,974 Replace water main valves. $32,454 CARMANGAY Purchase a public works truck. $18,000 Replace public works equipment. $10,500 CHAMPION Construct a recreational vehicle dump station. $25,000 Prepare a storm water and waterline engineering study. $50,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 24 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report COUTTS Rehabilitate a wastewater lagoon. $12,000 CREMONA Rehabilitate roads and sidewalk. $43,871 CZAR Upgrade a playground. $113,081 DONNELLY Purchase a grader. $75,000 DUCHESS Rehabilitate portions of roads and sidewalks. $261,190 EDGERTON Purchase a public works truck. $49,048 Rehabilitate a water reservoir. $175,000 ELNORA Construct a fence around the public works shop. $7,562 Install a wastewater lift station pump. $11,886 Purchase and install an emergency generator. $213,073 Purchase land for the construction of a pumphouse. $40,000 Purchase public works equipment. $15,886 Purchase waterline equipment. $6,115 Replace a skid steer. $4,900 Replace a skid steer. $5,000 Upgrade several roads, including sidewalks. $11,707 EMPRESS Purchase a water treatment plant chlorine monitor, and a supervisory control and $82,500 data acquisition system. Purchase back-up generators. $18,500 FOREMOST Purchase a mower. $16,950 Rehabilitate the storm water drainage system. $68,465 FORESTBURG Upgrade 47 Street, including waterlines. $50,861 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report GIROUXVILLE Purchase public works equipment. $130,000 Upgrade the community centre. $40,000 GLENWOOD Purchase and install a payment system at the bulk water filling and recreational $15,000 vehicle wastewater dumping stations. Purchase and install an emergency generator. $10,000 Repair water wells. $15,000 Replace public works equipment, including a mower. $37,000 HAY LAKES Prepare an infrastructure asset management study. $113,175 Replace the water station pumps. $88,838 HEISLER Purchase public works equipment. $15,500 HINES CREEK Rehabilitate several roads. $141,755 Replace public works equipment, including mowers. $30,600 HUGHENDEN Conduct an infrastructure assessment study. $100,000 Contribute funding to the Hughenden and District Community Hall Association to $15,000 renovate the hall. Upgrade the water treatment plant filtration system. $75,000 KITSCOTY Construct a portion of 46 Street. $100,000 Pave a portion of 48 Street. $165,000 Purchase a public works truck. $25,000 Purchase land for the construction of 46 Street. $75,000 Purchase public works equipment. $455,800 Rehabilitate a portion of 48 Street. $50,000 Rehabilitate a portion of 49 Avenue. $325,000 Rehabilitate a portion of 53 Avenue. $75,000 Rehabilitate the water treatment plant. $175,000 Upgrade internet infrastructure at several municipal facilities. $20,000 Upgrade the administration building. $40,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report LINDEN Construct a storm water drainage swale. $65,000 Rehabilitate a portion of wastewater lines. $250,000 Rehabilitate a wastewater lagoon. $120,000 LOMOND Purchase public works equipment. $6,149 Rehabilitate gravel roads. $32,000 LOUGHEED Purchase a mower. $12,063 MANNVILLE Develop a community event and green space, including the purchase of land. $25,000 Purchase equipment for the Mannville Riverview Golf Course. $70,000 Rehabilitate a portion of 51 Street. $58,182 Rehabilitate several sidewalks. $30,000 Replace the server. $20,000 Upgrade a wastewater lift station, including digital and electrical systems. $80,000 MARWAYNE Construct a trail system. $21,534 Upgrade several roads. $96,804 Upgrade the water treatment plant. $80,000 MILO Contribute funding to the Milo and District Fire Association to upgrade the fire $14,000 service truck and equipment. Rehabilitate wastewater lines. $171,797 MUNSON Rehabilitate a portion of Centre Avenue. $410,000 Rehabilitate a portion of roads. $500,000 MYRNAM Rehabilitate several roads. $40,000 Replace a backhoe. $95,708 Replace a portion of sidewalks. $43,444 Replace a public works vehicle. $50,000 Replace several sidewalks. $8,630 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 27 Project descriptions and amounts include accepted amendments as of January 30, 2023. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2022 Accepted Projects Report MYRNAM Replace water valves and meters. $8,005 Replace a skid steer. $40,000 Replace wastewater equipment. $8,500 PARADISE VALLEY Contribute funding to the Alberta Central East Water Corporation to expand the $27,000 regional waterline system. ROCKYFORD Replace the waterline valve. $12,784 Replace waterlines. $59,850 RYCROFT Rehabilitate roads and storm water drainage infrastructure. $91,277 Rehabilitate several roads. $531,950 Rehabilitate the wastewater main. $250,000 Rehabilitate the wastewater system. $250,000 Rehabilitate the water reservoir berm. $23,000 Replace the water treatment plant roof. $55,000 STIRLING Purchase a dump truck. $170,691 WARNER Install a portion of water and wastewater lines along 1 Avenue. $75,000 YOUNGSTOWN Rehabilitate a portion of wastewater line. $100,000 Replace a water distribution pump and control valve. $50,000 Replace fire hydrants. $30,000 Summer Village Accepted Amount