Village Accepted Amount ALBERTA BEACH Rehabilitate a portion of roads. $151,134 Rehabilitate the storm water infrastructure. $119,720 ALIX Upgrade the 54 Street wastewater lift station. $487,961 ALLIANCE Apply dust abatement to gravel roads. $8,000 Purchase a lawn mower. $25,000 Rehabilitate a portion of roads. $16,000 Replace sidewalks. $22,000 ANDREW Upgrade a bulk water station. $75,000 BARONS Construct an outdoor skating rink. $46,800 Purchase public works equipment. $4,000 Rehabilitate portions of roads. $65,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 22 Project descriptions and amounts include accepted amendments as of February 29, 2024. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2023 Accepted Projects Report BARONS Upgrade the municipal office building. $30,000 BERWYN Install a playground. $60,000 Pave Main Street. $200,000 Replace a water pump. $50,000 Upgrade the administration building. $50,000 Upgrade the manholes. $10,000 BITTERN LAKE Rehabilitate storm water infrastructure. $59,295 Replace a portion of waterline. $14,471 BRETON Replace the playground equipment at Centennial Park. $180,000 CARBON Purchase public works equipment. $30,384 Replace public works vehicles. $109,548 Replace the heating system in the public works bay. $4,500 Replace the storm waterline. $22,478 CARMANGAY Purchase a dump truck. $10,512 Rehabilitate a public works tractor. $12,170 Rehabilitate solar panels. $3,308 Replace water meters. $13,500 Upgrade the water plant. $52,652 CAROLINE Demolish a building and remediate the land due to safety concerns. $40,000 Prepare an infrastructure asset management plan. $75,000 Prepare engineering plans for roadways. $38,089 Replace a public works truck and snowblower. $85,000 CHIPMAN Purchase public works equipment. $46,250 Rehabilitate a bridge. $23,750 CLIVE Purchase solid waste and recycling carts. $61,590 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 23 Project descriptions and amounts include accepted amendments as of February 29, 2024. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2023 Accepted Projects Report CLIVE Rehabilitate 47 Street and 49 Avenue, including underground infrastructure. $248,847 CLYDE Purchase a loader. $83,140 COUTTS Pave a portion of road. $12,000 Rehabilitate the spray park. $12,000 Rehabilitate the wastewater lagoon. $12,000 Replace a portion of wastewater line. $14,633 COWLEY Rehabilitate portions of wastewater lines. $100,890 CREMONA Construct concrete swales along East Street and 3 Street East. $18,000 Replace water meters. $60,000 DELIA Replace a fire hydrant. $20,000 Replace the wastewater main along 2 Street. $67,650 DONALDA Prepare design and engineering plans for a water reservoir and pump house. $250,000 Purchase public works equipment. $95,000 Rehabilitate the water storage tank, including service lines. $50,000 Replace a portion of sidewalks. $100,000 DUCHESS Upgrade storm water drainage infrastructure. $140,119 EDGERTON Purchase a mower. $20,515 Purchase public works equipment. $64,469 Rehabilitate a wastewater lift station. $75,000 Replace the water valves along 51 Street. $10,531 ELNORA Construct a water pump station and reservoir. $436,911 Relocate and renovate the administration office, library, and create a multi-use $445,000 facility. EMPRESS Upgrade a portion of wastewater lines. $119,260 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 24 Project descriptions and amounts include accepted amendments as of February 29, 2024. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2023 Accepted Projects Report FOREMOST Prepare design and engineering plans for a waterline extension. $22,652 Purchase a mower. $24,500 Purchase a street sweeper. $19,550 Rehabilitate roads. $12,466 Replace the water pump. $4,882 Replace the water well pumps. $7,201 Upgrade the storm water drainage system. $18,000 FORESTBURG Construct a waterline to the southern industrial subdivision. $234,984 GIROUXVILLE Install a control system at the wastewater lift station. $19,000 Replace the dispenser system at the water fill station. $15,000 GLENDON Upgrade the municipal office. $89,257 GLENWOOD Rehabilitate several roads. $263,331 Replace the water treatment plant valves. $20,000 Upgrade the administration office. $20,000 Upgrade the community hall, including flooring and insulation. $20,000 HALKIRK Demolish a municipally owned building due to health and safety concerns. $35,000 Rehabilitate several roads. $310,000 HINES CREEK Rehabilitate a water treatment plant. $152,976 Rehabilitate several roads. $32,500 Upgrade the community centre. $111,926 HOLDEN Purchase a public works vehicle. $25,711 Rehabilitate a portion of roads. $145,000 Upgrade the wastewater lift station. $51,495 HUGHENDEN Rehabilitate the wastewater lift station. $90,000 Upgrade the water treatment plant. $197,359 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 25 Project descriptions and amounts include accepted amendments as of February 29, 2024. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2023 Accepted Projects Report INNISFREE Install a portion of waterline along 51 Avenue. $163,038 Replace a waterline along 50 Street. $250,000 KITSCOTY Rehabilitate a portion of 51 Street. $100,000 LINDEN Rehabilitate a water reservoir. $40,000 Rehabilitate portions of wastewater lines. $55,000 Replace a portion of wastewater line. $30,000 LOMOND Replace a portion of wastewater line. $20,446 LOUGHEED Upgrade wastewater lift stations. $160,000 MANNVILLE Purchase a public works vehicle. $48,000 Upgrade the fire pump at the water reservoir. $60,000 Upgrade the irrigation system at the municipal Mannville Riverview Golf Course. $30,000 MUNSON Replace playground equipment. $200,000 MYRNAM Replace traffic signs. $6,099 NAMPA Rehabilitate the water main. $25,000 Upgrade water and wastewater infrastructure, including roadways. $376,000 PARADISE VALLEY Rehabilitate a portion of Pleasant Drive. $59,515 ROCKYFORD Purchase a public works tractor. $62,776 ROSALIND Contribute funding to the Rosalind Agricultural Society for the installation of solar $40,000 panels on the community hall. Install solar panels on municipal buildings. $122,400 Purchase a hydro-vacuum truck. $150,000 Purchase a mower. $22,000 Upgrade Memorial Park, including lighting. $30,000 This report reflects the name and status in effect for each municipality at the time the report was produced. Page 26 Project descriptions and amounts include accepted amendments as of February 29, 2024. Classification: Public MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2023 Accepted Projects Report ROSALIND Upgrade the wastewater lift station and water plant. $35,000 ROSEMARY Rehabilitate roads and sidewalks. $232,662 SPRING LAKE Prepare a storm water management plan. $150,000 STIRLING Purchase a fire command vehicle. $57,143 Purchase fire pumps. $27,600 Replace a fire truck. $166,400 Upgrade the wastewater lift station. $43,127 WARBURG Contribute funding to the Warburg Hockey and Skating Arena Club for arena $110,814 upgrades. WASKATENAU Upgrade several community and recreational facilities. $118,000 YOUNGSTOWN Purchase public works equipment. $50,000 Rehabilitate a portion of wastewater lines. $90,000 Replace a fire hydrant. $20,000 Replace the wastewater line along Main Street. $100,000 Replace water isolation valves. $25,000 Summer Village Accepted Amount